Front Porch & Downstairs Toilet Extension Bedford

This project was an extension to the front of the house to incorporate a downstairs toilet. The job took about 8 weeks due to the bad weather during November and December but our priority was to get the roof on as early as possible.

During the construction of the extension the clients also asked us to extend the block paving to enable them to park two cars on the front drive.